DESERT DROPDUMPSTERS
Phoenix MetroCall (602) 905-4338
Phoenix 10-yard rentals

COMPACT CAPACITY. A CLEANER PROJECT PLAN.

A smaller-footprint option for focused cleanouts, light renovation debris, and projects where placement space matters. Send the ZIP, material, and date for an availability review.

  • 10-yard planning range: $399–$475*
  • ZIP-confirmed availability
  • No-pressure review

*Planning range for standard nonhazardous projects. Final price, availability, included time, included weight, and adjustments are confirmed before booking.

Desert Drop roll-off truck and navy dumpster
PHOENIX METRODROP IT. LOAD IT. DONE.
PROJECT FIT

BUILT AROUND THE WORK.

The right container depends on the debris, placement, schedule, and service ZIP—not just the name of the project.

01

Focused cleanouts

A practical option for garages, rooms, and smaller household cleanout projects.

02

Small renovations

Useful for bathroom work, flooring, cabinetry, and limited-volume construction debris.

03

Tighter placement

A shorter container footprint may work where a larger roll-off is impractical, subject to access review.

SMART AVAILABILITY REQUEST

GIVE US THE JOB.
WE’LL REVIEW THE FIT.

Complete project details receive the fastest response. We review location, material, access, timing, and container size before confirming availability or pricing.

1Send the essentialsAddress area, debris, placement, date, and project scope.
2Receive a clear next stepQualified projects move directly to availability and package review.
3Confirm before bookingNo rental is final until price, terms, and schedule are approved.
CHECK MY PROJECTStep 1 of 2

By submitting, you agree to be contacted about this request. Final approval, availability, and pricing are confirmed separately.

We received your project.Your details were sent securely to Desert Drop for review.
BEFORE YOU BOOK

THE DETAILS STAY CLEAR.

Delivered package

Delivery, pickup, one haul, and the estimated total are shown together.

Included time

Your quote identifies the rental period before any extension.

Included weight

Tonnage and possible overage are disclosed before approval.

Project exceptions

Distance, heavy material, access, and placement concerns are reviewed first.

CallCheck availability